| Generally: |
The properties are constructed to the highest standards. The main structure consists of reinforced concrete ring beams tied through concrete blocks to a hipped roof finished with Wallaba shingles. Concrete floors run through out the properties finished with tiles to bathrooms. |
| |
|
| Walls & ceilings: |
Rendered & finished in natural troweltex. Ceilings are pickled pine tongue & grooved boarding with satin white cornice detail. |
| |
|
| Joinery: |
Moulded skirting with matching architrave, painted satin white. Open plan staircase with pickled pine treads and satin white staircase. |
| |
|
| Window: |
Low maintenance purpose made UPVC windows finished in white. |
| |
|
| Doors: |
Solid paneled and louver doors, painted and finished with chrome finish ironmongery. |
| |
|
Kitchen &
appliances: |
Comprehensively fitted kitchen with marble tiled worktops, incorporating SMEG oven and hob, hood & dishwasher with GE double door fridge/freezer, plus self-contained laundry with Whirlpool washer & dryer combination. |
| |
|
| Bedrooms: |
Bedrooms have fitted wardrobes with sliding louvered doors finished in satin white with stainless steel handles. |
| |
|
| Bathrooms: |
Stark white sanitary ware, vessel basins with chrome faucets & hardwood vanity tables with matching mirrors. |
| |
|
| Showers: |
Stark white contemporary tiling to floor & walls. |
| |
|
| Electrical: |
The installation incorporates power, telephone & TV points together with low voltage down lighters, wall up-lighters & separate switchable lamp circuits. |
| |
|
| Decoration: |
All joinery painted with pickled pine ceilings. |
| |
|
| Plunge pool: |
The plunge pools vary in size between units, finished with mosaic and Diamond Brite. |
| |
|
| Landscaping: |
Comprehensively landscaped with tropical plants, irrigation systems & external lighting. |
| |
|
| Timescale: |
Completed 2007 |
|
|